Raduzhny, KhMAO. OAO Varioganneft, subsidiary of RussNeft, continues to develop the oil production infrastructure.
For example, a number of facilities have been constructed at Varioganskoye field. A new 4 MW gas boiler was commissioned to provide heating to the office and amenities building and the tubing repair workshop of OAO Varioganneft. The boiler upgrade allowed to minimize the Varioganskoye field facilities heating costs and to raise the associated gas utilization ratio.
PPT-0,2G oil heater was constructed and commissioned at Booster Pump Station No.2 which allowed to significantly improve the hydrocarbons treatment quality and organize LACT metering of the oil and gas produced at Novo-Agansk license area.
Besides, construction of Well pad 114 was completed at Varioganskoye field, including infrastructure like access road, oil and gas gathering line, and overhead electric power line.
OAO Varioganneft will continue the social and engineering infrastructure development program at Variogan group of fields. The plan is to implement a large-scale program for development of Tagrinsky license area: construction of new well pads, upgrade of the in-field roads, rehabilitation of the existing and construction of new oil gathering networks.