© 2005–2025 ПАО НК «РуссНефть»

"Aganneftagasgeologia" put into operation the well at Roslavlskoye oilfield

01.06.2011 "Tyumenskaya Linia”

Nizhnevartovsk, KhMAO. OAO MPC “Aganneftegasgeologia” ( a subsidiary of “RussNeft” ) has put into operation horizontal well No 1907 at well pad No 20 of Roslavlskoye oilfield within the frames of the drilling program for 2011.

The daily flow rate of the drilled horizontal well made 630 tons. The horizontal wellbore is 33 meters long. In the process of drilling formation БВ-8 was tapped. Roslavlskoye oilfield has been  under commercial development since 2000, it accounts for almost 50% of oil produced by the company, says the press-service of OAO MPC “ANGG”.

 

Putting into operation of horizontal well No 1097 permitted to stabilize oil production extent and to form up a stable tendency of growth of production figures. Implementation of the drilling program at “Aganneftegasgeologia” will go on. In the near future it is planned to strat drilling a horizontal wellbore of well No 403 at Golevoye oilfield. It is supposed to be 500 meters long. The expected daily flow rate  will amount to 120 tons.

More news

All Show all

International Forum "Russian Energy Week - 2025"

"Russian Energy Week" is the world's leading industry event, bringing together officials, businessmen and experts to discuss the fuel and energy sector development.

RussNeft reported on the planned stocking of rivers in the Khanty-Mansiysk Autonomous Okrug

The company's press service reported on the completion of work to replenish the Ob River basin with fish resources. 1.1 million young nelma and muksun were released.