16.11.2011
“Komsomolskaya Pravda Izhevsk”
Izhevsk. OAO “Belkamneft”, a subsidiary enterprise of OAO NK “RussNeft”, has completed the planned preparations for the autumn-winter period 2011-2012. The Enterprise has performed the whole complex of works necessary to ensure continuous operation of energy economy and oil field equipment, the press-service of the company informs.
Particular attention was paid to the preparation of the objects of power for work at low temperatures. To check the availability of the power supply system in winter period Special Commission was established. Its membership includes representatives of OAO “Belkamneft”, West-Ural Rostekhnadzor Administration and the branch of “Udmurtenergo”. The Commission verified the technical condition of the objects of power, compliance with the legislation of the Russian Federation on industrial safety, the anti-emergency workouts at low temperatures, etc.
Having evaluated all the results of the work on the preparations for the autumn-winter period held by OAO “Belkamneft”, the Commission confirmed readiness of the Enterprise to work in conditions of low temperatures.