Khany-Mansiisk. A number of the objects of industrial infrastructure is built and put into exploitation by a subsidiary of "RussNeft" - "Aki-Otyr" within the complex program of oifields development at Shapshinskoye group of oilfields.
In the current year there has been built the oil pipeline Verkhne-Shaphinskoye oilfield - oil treatment unit of Nizhne-Shapshinskoye oilfield, 60 km long. Construction of a booster pump station has been started.
The first stage of associated gas-powered gas piston station has been put into operation at Nizhne-Shapshinskoye oilfield. Putting of the station into operation meets the electric power requirements of the oilfield of Shaphinskoye group of oilfields in full extent and in 2011 will have permitted to bring the level of utilization of associated gas up to 95%.