14.12.2011
"Fedpress.ru"
Izhevsk. OAO “Belkamneft”, a subsidiary enterprise of OAO NK “RussNeft”, completed the construction of distributing point at Tzentralnoye oilfield. As was reported to “FederalPress” today, December, 14, in “RussNeft” press-service, estimated cost of new energy facility amounted to 20.5 million rubles.
The building of the distribution point is equipped with modern facilities. Implementation of this project will enhance electric reliability of the oilfield, increase service options in the management, maintenance equipment and energy accounting as well as will reduce the loss of crude oil in the repair and emergency shutdowns.
After receiving service permission from the Directorate of the Rostechnadzor for the Udmurt Republic, works will be carried out on including new distributing point into the existing network.